Home  /  Projects  /  Custom New Home Construction with Pool in Southern California
Featured project

Custom New Home Construction with Pool in Southern California

Custom home construction in Southern California, with updated exterior and roof views, interior drywall and tile progress, and a concrete pool shell. Explore the project from early construction through the latest progress photos.

CA New Home Construction
Custom New Home Construction with Pool in Southern California — project overview

Project details

LocationCA
Service areaSouthern California

Follow one custom home through foundations, framing, roof construction, interior work, and the backyard. These photographs document multiple stages of an active construction project.

Select a photo for a closer look. Each caption explains the work visible in that view.

LATEST / OCTOBER PROGRESS

October: cabinetry, lighting and finish work

The latest photos show kitchen and pantry cabinetry, interior lighting, exterior finish work and large sliding doors. Crew members continue the kitchen installation. These views document work in progress, before final completion and handover.

Exterior finish work and black-framed windows during the custom-home build.
Exterior finish work and black-framed windows during the custom-home build.
Large sliding doors connect the interior to the covered outdoor area during construction.
Large sliding doors connect the interior to the covered outdoor area during construction.
October interior progress with recessed lighting, a lit feature wall and wide sliding doors.
October interior progress with recessed lighting, a lit feature wall and wide sliding doors.
Kitchen cabinets and island with work surfaces in place; installation is still underway.
Kitchen cabinets and island with work surfaces in place; installation is still underway.
Dark pantry cabinetry and light work surfaces during interior finishing.
Dark pantry cabinetry and light work surfaces during interior finishing.
The open kitchen and living area during the October finishing stage.
The open kitchen and living area during the October finishing stage.
A Home Remodeling Builders crew member works on the kitchen cabinetry.
A Home Remodeling Builders crew member works on the kitchen cabinetry.
A Home Remodeling Builders crew member works at the kitchen island.
A Home Remodeling Builders crew member works at the kitchen island.
Home Remodeling Builders project graphic illustrating custom home roof stages.
Project stages documented by Home Remodeling Builders. Explore the individual photos for a closer look.

01 / PROJECT PROGRESS

Foundations and framing

Early photographs show the footprint and framing before the roof and interior layers take shape.

Aerial view of the custom home site during early foundation work.
Aerial view of the custom home site during early foundation work.
Crew working within the open wall framing.
Crew working within the open wall framing.
Front view of wall and roof framing in progress.
Front view of wall and roof framing in progress.

02 / PROJECT PROGRESS

The roof, layer by layer

The same home progresses from exposed roof framing to decking and later roof covering. Compare the overall footprint and openings across these construction stages.

Top-down view of exposed roof framing.
Top-down view of exposed roof framing.
Roof decking in place over the framed custom home.
Roof decking in place over the framed custom home.
Later overhead view of the roof covering and roof openings.
Later overhead view of the roof covering and roof openings.

03 / PROJECT PROGRESS

Exterior walls and openings

Wall sheathing, weather protection, windows, and exterior finish work appear at different stages around the house.

Rear exterior wall sheathing and large openings under construction.
Rear exterior wall sheathing and large openings under construction.
Exterior building wrap and scaffolding during construction.
Exterior building wrap and scaffolding during construction.
Front exterior with wall finish work and scaffolding in progress.
Front exterior with wall finish work and scaffolding in progress.

Planning a substantial change to your home?

Share your city, the spaces you want to change, and your priorities. We will help you discuss a practical next step for your property.

04 / PROJECT PROGRESS

Plan the work inside the walls

Open framing gives a view of utility routes and the spaces they serve. The photographs show work in progress rather than a claim of completed inspections.

Open great-room framing with visible ceiling duct routes.
Open great-room framing with visible ceiling duct routes.
Worker installing ductwork within the framed ceiling.
Worker installing ductwork within the framed ceiling.
Plumbing rough-in within framed interior walls.
Plumbing rough-in within framed interior walls.

05 / PROJECT PROGRESS

Insulation and drywall

The interior changes as insulation is installed, boards arrive, and drywall defines the rooms.

Ceiling insulation above an interior area with drywall boards staged.
Ceiling insulation above an interior area with drywall boards staged.
Drywall boards being unloaded for the project.
Drywall boards being unloaded for the project.
Great room with drywall surfaces and a large ceiling opening.
Great room with drywall surfaces and a large ceiling opening.
Hallway with drywall work in progress.
Hallway with drywall work in progress.
Interior room with unfinished drywall surfaces.
Interior room with unfinished drywall surfaces.

06 / PROJECT PROGRESS

Bathroom preparation and tile

These views document preparation and tile installation within the custom home. Discuss substrates, waterproofing, drainage, and finish details during planning.

Worker preparing a wall beneath a bathroom window.
Worker preparing a wall beneath a bathroom window.
Tile installation in progress at an interior doorway.
Tile installation in progress at an interior doorway.
Interior room with tiled surfaces and drywall work in progress.
Interior room with tiled surfaces and drywall work in progress.
Bathroom ceiling and skylight area during drywall work.
Bathroom ceiling and skylight area during drywall work.

07 / PROJECT PROGRESS

The home and backyard together

The backyard sequence moves from earlier pool removal and preparation to a later new pool shell. Site access and adjacent construction remain visible.

Earlier pool removal and site preparation beside the custom home.
Earlier pool removal and site preparation beside the custom home.
Later concrete pool shell under construction.
Later concrete pool shell under construction.
Narrow side access area during excavation work.
Narrow side access area during excavation work.
Side trench with reinforcement visible during construction.
Side trench with reinforcement visible during construction.

August: work around the home

Material handling, excavation and interior finishing progress alongside the main construction sequence.

A loader and crew move excavated material during the custom home build.
A loader and crew move excavated material during the custom home build.
A crew member in a branded shirt levels material in the work trailer.
A crew member in a branded shirt levels material in the work trailer.
The great room during interior finishing, with the recessed ceiling and wide backyard opening visible.
The great room during interior finishing, with the recessed ceiling and wide backyard opening visible.
Crew working in the excavation near the front of the custom home.
Crew working in the excavation near the front of the custom home.

September: exterior and tile work

The crew works through exterior wall finishes, bathroom tile fitting and tile cutting. These are progress photographs taken before final completion.

Exterior wall work during the textured stucco stage.
Exterior wall work during the textured stucco stage.
September exterior progress: crew finishing the wall from scaffolding.
September exterior progress: crew finishing the wall from scaffolding.
A crew member in a branded shirt prepares the interior floor edge.
A crew member in a branded shirt prepares the interior floor edge.
Large wall tiles being fitted in the bathroom corner.
Large wall tiles being fitted in the bathroom corner.
A crew member in a branded shirt checks the upper bathroom wall tile.
A crew member in a branded shirt checks the upper bathroom wall tile.
A Home Remodeling Builders crew member works at the tile cutting station.
A Home Remodeling Builders crew member works at the tile cutting station.

September: kitchen and pantry

Cabinets and the kitchen island are in place as interior installation continues. The photographs show the open living area and the pantry during finishing.

September kitchen progress with cabinets and the island in place.
September kitchen progress with cabinets and the island in place.
A reverse view of the kitchen and open living area during installation.
A reverse view of the kitchen and open living area during installation.
Pantry cabinetry and work surface during interior finishing.
Pantry cabinetry and work surface during interior finishing.

Plan your next project

Use these related services and planning resources to explore the right direction for your home.

A closer look at the project

Project videos

Watch project videos (18)

Video 1

Video 2

Video 3

Video 4

Video 5

Video 6

Video 7

Video 8

Video 9

Video 10

Video 11

Video 12

Video 13

Video 14

Video 15

Video 16

Video 17

Video 18

Next step

Like this direction?

Tell us about your home, your priorities, and the type of finish or layout change you want to achieve.

From our customers, on Google

Customer Reviews

Real experiences, in our customers’ own words. See what homeowners say about working with Home Remodeling Builders.

5.0★★★★★126 Google reviews
Rafael Ojeda
Google
★★★★★

My name is rafa I just did my bathroom with Tal and I'm super happy with the results. Also very good price and experience. Thank you very much very recommended.

View on Google ↗
Dionicio Morales
Google
★★★★★

Excelente company to Work with they Painted my whole house in and out and im very happy with everything. Highly recommend. Beverly Hills contractor

View on Google ↗
Araceli Flores
Google
★★★★★

My friend recommended me this company for my bathroom and gutters. Everything came out perfect no complaints. Highly recommend!!!! Thanks Tal!!! Good contractor in Riverside area

View on Google ↗

Showing 3 of 125 selected reviews · Latest + earlier months

Planning a remodeling project?

Tell us what you have in mind. We’ll help you plan the next step.

Get a free estimate